AI Production Readiness Scorecard
Twenty questions on what has to be true before an AI pilot runs in production. You see your score on this page before you give us anything.
- Yes: in place, written down, and someone other than its author can show it.
- Partly: in place informally, or for some of the work.
- Not yet: not in place, or you are not sure.
The score is calculated in your browser. With JavaScript turned off you can still read the 20 questions and their articles.
Your result
Score 0 out of 100
This score comes from your own answers and a fixed rule. It is not an assessment, audit or certification of your system, and it does not guarantee any result.
Band
By group
Weakest group: Integrated. It sets your first next step.
Weakest group: Secure. It sets your first next step.
Weakest group: Governed. It sets your first next step.
Weakest group: Accountable. It sets your first next step.
Weakest group: Built to run. It sets your first next step.
No group stands out as the weakest.
Your score is 75 or more, and {groups} scored under 10, so the result stays at Part of the way to production.What it means
Your answers show that most of what production needs is still to be decided. A pilot shows that an idea can work. Production needs more than the idea: connection to the live systems, security that passes review, controls on sensitive actions, and named owners. Deciding it in a short written page is the first piece of work.
Next steps
- Write the production definition on one page: the systems it connects to, what it may read and write, the actions that need an approver, and the two owners. Start from Production AI engineering.
- Name the business owner and the technical owner, each with a backup. See Who owns an AI system after go-live.
- Pick the weakest group on this page and settle its four questions in writing before you add scope. See Why AI pilots stall.
Bring us the problem. We move the system from concept or pilot to production.
What it means
Your answers show that a good part of what production needs is decided. The gaps are specific, and each one is a decision someone has to take. A go-live decision rests on named owners and on approval gates for sensitive automated actions.
Next steps
- Close the weakest group first. Its four questions are listed in your report, each with the decision it needs and the person who takes it.
- Test what you have written. Switch a connection off, send a bad record and ask a colleague to explain one decision from the record alone. See Integrating an AI pilot with the systems you already run.
- Put what is decided on the production page and have both owners sign it. See How to move an AI pilot to production.
One call is enough to know whether we can help.
What it means
Your answers show that most of what production needs is in place and written down. The remaining work is keeping it true after go-live: monitoring, change control and a regular review of real work. A system is only as ready as its newest change.
Next steps
- Answer the questions you scored as Partly. A Partly answer is a decision that exists in someone's head and not yet on the page.
- Run the review in group 5 on a schedule, with a named reviewer. See LLM observability vs monitoring.
- Repeat this scorecard after each major change to the model, the instructions or a connected system.
Governed from the first line of code.
Link to this result (it holds only the scores)
Your AI Production Readiness Report
Get the report for your band: the 20 questions with the decision each one needs, who usually takes it, a one-page production definition to complete and the order of work.
What does production ready mean for an AI system?
An AI system is production ready when it runs inside your operation, can be explained when it is questioned, and is owned by named people. Production AI engineering is the set of decisions and controls that make this true: how the system is evaluated, observed, connected to the systems you already run, controlled and owned.
How is the score calculated?
Each of the 20 questions is answered Yes, Partly or Not yet. Yes counts 5 points, Partly 2 and Not yet 0, so each group of four questions scores 0 to 20 and the total scores 0 to 100. Under 40 is Pilot stage, 40 to 74 is Part of the way to production, and 75 or more is Close to production when no group scores under 10. The calculation runs in your browser.
What does the report contain?
The report repeats your band and the 20 questions. For each question it gives the decision it needs and who usually takes it, with the article to read. It ends with a one-page production definition to complete and the order of work for your band.
What we store and why.
Your answers are scored in your browser. We record an anonymous event when the scorecard is started, completed and when a report is requested (score, band and the page you came from; no name, email, IP address or cookie), only to measure how the page is used. The result link contains your scores only, nothing that identifies you. If you request the report, we store your name, work email, company, role, scores and answers in our own systems to give you the report and, only if you ticked the box, to contact you about your result. Data is processed in the United States. We keep form details for up to 3 years after your request, and anonymous events for up to 12 months. To see, correct or delete your data, write to [email protected]. Privacy policy: www.ornsoft.com/privacy-policy.